Skip to main content
Kitchen Masters

Bathroom Remodeling in Greater Baltimore

We remodel primary bathrooms, hall baths and powder rooms: showers, tubs, tile, vanities, plumbing and lighting. The work behind the walls is done right, from waterproofing to licensed plumbing and electrical rough-in.

Typical investment
$15,000–$80,000+
Bathroom with a blue vanity and a frameless glass walk-in shower

Who it’s for

  • Converting a tub to a walk-in shower
  • Adding a double vanity or more storage
  • A full primary bathroom renovation
  • Updating a hall bath on the existing plumbing

What’s included

Design & 3D renderings
A space plan that makes the most of every square foot.
Waterproofing
Schluter-KERDI membrane systems behind tiled showers.
Plumbing & electrical
Rough-in by licensed plumbers and electricians before tile goes up.
Tile
Porcelain, natural stone and mosaic for walls, floors, niches and benches.
Vanities & tops
Single or double vanities with quartz tops.
Fixtures & glass
Fixtures from brands such as Kohler, Delta and Moen, and frameless glass enclosures.
Permits & inspections
We pull the permits and schedule the inspections.

Investment & timeline

Typical project investment

Most bathroom remodels fall between $15,000 and $80,000+, depending on size and scope.

Hall bath update

$15,000–$25,000

New tile, vanity and fixtures with the plumbing in its existing locations.

Primary bath renovation

$40,000–$80,000+

Full gut with custom tile, walk-in shower, freestanding tub, heated floors and premium fixtures.

Your price comes from a detailed written estimate after a free in-home consultation.

How long it takes

You get a day-by-day schedule before work begins.

Remodel on existing plumbing
2–3 weeks
Primary bath gut renovation
4–6 weeks
Expanded footprint or structural changes
6–8 weeks

What affects the price

Tile
Material and coverage are often the biggest variable; fully tiled showers with niches and benches add up.
Moving plumbing
Keeping the toilet, shower and vanity where they are saves significant cost.
Shower & tub configuration
Curbless showers, frameless glass and freestanding tubs each add scope.
Vanity & countertops
Double vanities, custom sizes and stone tops cost more than standard units.
Comfort upgrades
Heated floors, better ventilation and lighting upgrades add electrical work.
Existing conditions
Older homes may need outdated pipes or ventilation brought up to current standards.

Our work

Photos

How it works

Six steps, start to finish

You know what happens next at every stage, and who is responsible for it.

  1. 1

    Consultation

    A free in-home visit to measure, see existing conditions and talk through goals and budget.

  2. 2

    Design

    Layout options with 3D renderings so you can see the room before anything is ordered.

  3. 3

    Selections & Proposal

    Guidance choosing materials, then a detailed, line-item written estimate.

  4. 4

    Pre-Construction

    Permits filed, materials ordered and trades scheduled before demolition starts.

  5. 5

    Construction

    A contained, clean job site with daily quality checks and weekly progress updates.

  6. 6

    Final Walkthrough

    We review every detail with you and resolve punch-list items before calling it done.

Selections

Choosing materials

We guide you through each selection, with samples and showroom visits, before anything is ordered.

Tile
Porcelain, natural stone and mosaics for floors, walls, niches and accents.
Vanities
Painted or wood finishes, single or double, with quartz tops.
Showers & tubs
Walk-in and curbless showers, frameless glass, benches and soaking tubs.
Fixtures
Faucets, rainfall and handheld showers, and toilets from established brands.
Lighting & ventilation
Vanity lighting, recessed lights and properly sized exhaust fans.

Permits

In Maryland, most bathroom remodels need permits for new or relocated plumbing, added electrical, structural changes or ventilation changes. We file the applications and schedule the inspections, and licensed plumbers and electricians complete the rough-in.

During construction

  • Dust containment and cleanup at the end of each day
  • Waterproofing installed and checked before tile is set
  • Licensed plumbing and electrical rough-in before finishes go in
  • A final inspection of grout lines, tile alignment, fixtures, caulk joints and drainage

Why Kitchen Masters

An organized remodel, from plan to punch list

What working with us looks like in practice.

  1. 01

    See it before it’s built

    Layout options with 3D renderings during design, so decisions are made before materials are ordered.

  2. 02

    A line-item written estimate

    You see exactly what is included in your remodel, item by item.

  3. 03

    Permits and inspections handled

    We pull permits and schedule inspections. Maryland Home Improvement Commission license #157680.

  4. 04

    A contained, clean job site

    Dust barriers and cleanup at the end of every workday keep your home livable.

  5. 05

    Weekly progress updates

    Regular updates with photos, so you always know where the project stands.

  6. 06

    A walkthrough before we call it done

    Punch-list items resolved, backed by a 1-year workmanship warranty.

FAQ

Bathroom Remodeling: common questions

How much does a bathroom remodel cost in Baltimore?

Bathroom remodels range from $15,000–$25,000 for a hall bath update to $40,000–$80,000+ for a primary bathroom gut renovation with custom tile, a walk-in shower, freestanding tub, heated floors and premium fixtures. We provide a detailed written estimate after a free consultation.

How long does a bathroom renovation take?

A remodel on existing plumbing takes 2 to 3 weeks. A full primary bath gut renovation runs 4 to 6 weeks. Projects that expand the footprint or change the structure can take 6 to 8 weeks. You get a day-by-day schedule before work begins.

Does a bathroom remodel require permits in Maryland?

In most cases, yes. Permits are required for new or relocated plumbing, added electrical work, structural changes and ventilation changes. We handle the applications and inspection scheduling.

What are popular bathroom upgrades?

Curbless walk-in showers with frameless glass, heated tile floors and floating double vanities with quartz tops are common choices, along with freestanding soaking tubs in larger primary baths.

White flat-panel kitchen with a terracotta hexagon tile backsplash and stainless hood

Planning a bathroom remodel?

Tell us about your project. We reply within one business day to set up a free in-home consultation.

CallRequest a Consultation